Case Studies: Up to 99% Faster SAP Reporting for a Footwear Manufacturer, and Three More

SAP performance optimization

Year-end and statutory runs are weeks away, and runtime problems surface at the worst moment. SAP Performance Optimization matters most right now, because a report that took four hours in March can stall for a full night in December. Finance waits. Auditors wait. Nobody enjoys explaining why.

This post walks through four anonymised results from 2isolutions, a Toronto-based SAP partner serving Canadian clients. They include a footwear manufacturer with up to 99% faster SAP reporting. Each result is vendor-reported, and each carries the same proof: the output stayed identical, and only the processing time changed.

What Do These Four SAP Performance Results Actually Show?

These four cases show that slow SAP reports are usually a code and data-access problem, not a hardware problem. The vendor-reported gains range from over 60% faster statutory reporting to up to 99% faster reporting. In every case, the functional output stayed unchanged.

Here is the summary before we get into detail:

  • A footwear manufacturer saw up to 99% faster SAP reporting.
  • A cement producer saw up to 80% faster ABAP reports.
  • A steel producer saw 70% faster dispatch and billing.
  • A manufacturer saw over 60% faster statutory reporting.

Treat these as vendor-reported figures. They come from 2isolutions project records, and the Case Studies page on the 2isolutions site is the place to verify them. Your own results will depend on your data volumes, your custom code, and how long the system has gone without tuning.

Why the parity proof matters more than the speed

Speed claims are cheap. Anyone can make a report faster by dropping a filter or skipping a validation step. That is not tuning, it is damage.

So the test in each case was parity. The team ran the original report and the revised report against the same data set. Then they compared the outputs line by line. If a single total differed, the change failed and went back to development.

How the work was scoped in each case

Every engagement started the same way. First, the team picked the slowest reports that business users complained about most. Then they measured runtime on production-sized data, not on a thin test client. Finally, they agreed on a pass mark with the business owner before touching any code.

That last step matters. Writing a pass mark down in advance stops the project from drifting. It also gives finance leaders something concrete to sign off on.

Footwear Manufacturer: Up to 99% Faster Reporting

A footwear manufacturer’s SAP reports ran up to 99% faster after targeted tuning, and the output matched the original exactly. Seasonal product ranges, size and colour variants, and high transaction volumes had pushed the reports past the point of usefulness.

Footwear creates unusual data pressure. One shoe style can spawn dozens of size and colour combinations, and each combination becomes its own material record. Multiply that across seasons and you get tables that grow quickly. Reports written for a smaller catalogue start to crawl.

What typically causes this kind of slowdown

Reports that crawl on large variant data usually share a few root causes. We look for these first:

  • Nested loops that read database tables once per row instead of once per batch.
  • Missing or poorly chosen indexes on custom tables.
  • Selections that pull entire tables into memory before filtering.
  • Repeated calls to the same function inside a loop.

None of these changes what the report shows. They change how the system fetches and assembles the data. That is why parity is achievable, and why a 99% reduction in runtime is possible without touching a business rule.

What changed for the planners

For plants and merchandising teams, the practical effect is simple. A report that once forced a planner to wait until the next morning now finishes while the planner is still in the meeting. Decisions move up the calendar.

Think about a buyer reviewing stock by size run before a seasonal order closes. If the report takes hours, the buyer works from yesterday’s numbers. If it takes minutes, the buyer can check, adjust, and recheck before the supplier cutoff. The report did not get smarter. It simply got out of the way.

Cement and Steel: Faster ABAP Reports and Dispatch

The cement producer’s ABAP reports ran up to 80% faster, and the steel producer’s dispatch and billing ran 70% faster. Both sit in heavy industry, where delays at the weighbridge or the invoicing desk cost real money every hour.

ABAP, short for Advanced Business Application Programming, is SAP’s own programming language for custom reports and extensions. Most long-running SAP complaints trace back to custom ABAP written years ago, often by people who have since left.

Cement: reports that planners trust again

A cement plant runs on tight material flows. Limestone, clinker, fuel, and finished product all move in large volumes, and every movement posts to the system. After a few years, the reports that summarise those movements slow down because the tables behind them keep growing.

The team profiled the slowest ABAP reports and found the usual suspects: unfiltered table reads, repeated lookups, and sorting done in the wrong place. Fixing them cut runtime by up to 80%. Planners had stopped trusting the reports because they arrived too late. Once the reports ran quickly, planners started using them again.

Steel: dispatch and billing without the queue

A steel producer lives and dies by dispatch speed. A truck waiting at the gate for paperwork burns fuel, blocks the yard, and annoys the customer. Billing delays add a second cost, because cash arrives later than it should.

Tuning the dispatch and billing programs brought a 70% reduction in processing time. Gate staff no longer waited on the system. Invoices went out the same day instead of piling up overnight. The business rules did not change. The code simply stopped doing unnecessary work.

Steps the team followed on both projects

The approach was repeatable, which is why it worked across two very different plants:

  1. Capture baseline runtimes on production-sized data.
  2. Trace each slow program to find where time disappears.
  3. Rewrite the expensive sections without changing logic.
  4. Run old and new versions side by side and compare every total.
  5. Release to production with a rollback plan ready.

Over 60% Faster Statutory Reporting for a Manufacturer

A manufacturer cut statutory reporting time by over 60% while keeping every figure identical to the previous output. Statutory runs carry deadlines that nobody can move, so speed here protects compliance as much as it saves time.

Statutory reports pull from many sources: finance postings, inventory valuation, tax codes, and sometimes legacy interfaces. They run at period end, when the system is already under heavy load. That combination turns a slow report into a deadline risk. For a broader view of how vendors are approaching speed and responsiveness across business processes, see these SAP customer experience innovations.

Why statutory runs slow down at the worst time

Period-end load stacks several jobs on the same database at once. Close activities, reconciliations, and reporting compete for the same resources. A report that runs fine on a quiet Tuesday can double in length on the last working day of the month.

The team looked at both the report logic and the timing. Some of the gain came from cleaner code. Some came from changing how and when data was prepared, so the heavy lifting no longer collided with other close jobs. Together, those changes delivered the over 60% improvement.

What finance teams gain from a faster close

A faster statutory run gives a controller breathing room. If the report finishes in the afternoon, there is time to review it, question an odd figure, and correct it before the filing date. If it finishes at midnight, the controller signs off tired and hopes for the best.

For auditors, the benefit is traceability. Because the output matched the old version exactly, the audit trail stayed intact. No one had to explain a changed number.

Why Manufacturers Keep Hitting the Same Reporting Wall

Manufacturers hit reporting slowdowns because data volumes grow every year while custom code stays frozen. A program that handled a modest table in 2018 may now read ten times as many rows, with no change to the logic that reads them.

This pattern is common across SAP Manufacturing environments, where production orders, material movements, and quality records pile up daily. The system itself rarely fails. Instead, performance erodes slowly until a deadline exposes it.

SAP Performance Optimization works best when it starts with measurement rather than guesses. Buying more hardware is the usual first reaction, and it is usually the wrong one. If a program makes ten thousand unnecessary database calls, faster servers just make ten thousand calls a little quicker.

Warning signs that a report needs attention

Watch for these signals in your own system:

  • Users schedule reports overnight that used to run on demand.
  • Jobs that finished in minutes now run for hours.
  • Teams export data to spreadsheets because the report is too slow.
  • Period-end close runs closer to the deadline each quarter.
  • Nobody on staff understands the custom code behind the report.

If three or more of these sound familiar, a tuning review will likely pay for itself.

How tuning fits with a move to S/4HANA

Many Canadian manufacturers are planning a move to SAP S/4HANA, SAP’s current ERP platform built on an in-memory database. Custom code that runs poorly today often runs poorly after migration too, unless someone cleans it up first. An SAP S/4HANA assessment is the sensible place to find those programs before they become cutover problems.

You can read more about the platform on the official SAP S/4HANA page. Teams planning an SAP S4HANA implementation Canada wide should treat custom code review as a standard early task, not an afterthought.

What a Good Tuning Engagement Looks Like

A good tuning engagement is short, measured, and tested against the original output. It starts with baselines, targets the slowest programs first, and ends with proof that nothing changed except speed.

Buyers sometimes expect a long program. In practice, many of the gains above came from focused work on a handful of programs. That is the real advantage of tuning over a full redesign: you get measurable results without rebuilding what already works.

Questions to ask any vendor

Before you hire anyone, ask these five questions:

  1. How will you prove the output stays identical?
  2. Which reports will you measure first, and on what data volume?
  3. Who owns the rollback plan?
  4. What happens to the custom code documentation afterward?
  5. Can you show results from a client in my industry?

A vendor who cannot answer the first question clearly is a risk. Parity is the whole point.

Where planning and reporting meet

Faster reporting also helps planning teams. When actuals arrive on time, finance can compare them with forecasts sooner. Organizations using SAP BPC planning, SAP’s budgeting and consolidation tool, depend on timely actuals to keep forecasts honest. A slow source report delays the whole planning cycle.

Reliable delivery also depends on who does the work. Firms offering SAP Consulting and Implementation Services should show they can tune existing code as well as build new functionality. Likewise, if you are choosing SAP Consulting Services Canada based, ask whether the team understands local statutory needs such as provincial tax reporting and Canadian year-end timing.

Frequently Asked Questions

Q. Are the 99% and 80% results guaranteed for every SAP system?

A. No. These are vendor-reported results from specific client projects, and your outcome depends on data volume, code quality, and current tuning. A short measurement phase will show what is realistic for your system.

Q. How do you prove that a faster report still gives the right numbers?

A. The team runs the original and revised reports on the same data set and compares the outputs line by line. 2isolutions treats any difference in totals as a failure, and the change returns to development until the results match.

Q. Do we need new hardware to speed up slow SAP reports?

A. Usually not. Most slow reports trace back to inefficient code or data access, so tuning the program often delivers more than adding servers. Hardware only helps once the code stops wasting work.

Q. Should we tune reports before or after an S/4HANA migration?

A. Before is better. Reviewing custom code during an SAP S/4HANA assessment lets you fix slow programs once, instead of carrying them into the new system and discovering problems at cutover.

Q. How long does a tuning engagement take?

A. It depends on how many programs you target. A focused engagement on a handful of slow reports can run for a few weeks, because baselines and parity testing take more time than the code changes themselves.

Start With Measurement, Not Assumptions

The four results in this post share one lesson. Slow reports rarely need new hardware or a full rebuild. They need someone to measure where time goes, fix the code that wastes it, and prove the output did not change.

Email us at info@2isolutions.com to see the case studies.