SAP Migration & Upgrades

SAP Migration & Upgrades

SAP Gold Partner · ECC → S/4HANA · SUM DMO · HANA Migration · Cloud Move

SAP Migration & Upgrades

SAP ECC mainstream maintenance ends in 2027. Every organisation on SAP ECC needs a clear migration plan. Every organisation on an older S/4HANA release needs an upgrade roadmap. And every organisation moving to RISE or GROW needs a migration strategy before committing commercially. 2iSolutions delivers SAP system migrations and version upgrades — ECC to S/4HANA conversion, Suite on HANA migration, S/4HANA version upgrades, OS/DB migration and cloud migration — as a certified SAP Gold Partner with the technical depth that comes from 21 years of continuous SAP delivery.

50 daysLava International Suite on HANA migration
2–3×Performance improvement post-HANA
SAP GoldPartner — S/4HANA & SUM DMO certified
98%On-time project delivery across SAP practice
Two Distinct Activities

SAP upgrades vs SAP migrations — what each involves and why both matter

The terms are used interchangeably but describe different technical activities. Many projects involve both simultaneously — an ECC-to-S/4HANA conversion that also moves to HANA database is both an upgrade and a migration. Understanding the distinction prevents scope surprises.

Application Change

SAP Version Upgrade

Moving the SAP application software to a newer release — new features, changed APIs, updated ABAP stack. The primary upgrade today is ECC to S/4HANA. Upgrade changes what SAP does; migration changes where it runs.

  • SAP ECC 6.0 → SAP S/4HANA (system conversion)
  • S/4HANA version upgrade (e.g. 1909 → 2023)
  • SAP Business One version upgrade
  • Support package stack (SPS) within a release
  • Custom code adaptation required for every upgrade
Platform Change

SAP Platform Migration

Moving the SAP system to a different database, operating system, infrastructure or cloud deployment — without necessarily changing the application version. Migration changes where SAP runs; upgrade changes what it does.

  • Database migration: AnyDB → SAP HANA (DMO)
  • OS migration: Unix → Linux (heterogeneous copy)
  • Suite on HANA (ECC on HANA DB without S/4HANA upgrade)
  • On-premise → cloud (hyperscaler or RISE)
  • System landscape consolidation (multi-system → one)

The most common combination — SUM DMO: ECC to S/4HANA conversion using SAP's Software Update Manager with Database Migration Option simultaneously upgrades ECC to S/4HANA and migrates the database from AnyDB to SAP HANA in a single technical operation. Both activities happen in one project; the distinction matters because each requires different preparation, tooling and testing.

Our Services

SAP migration & upgrade services — what we deliver

2iSolutions SAP Migration & Upgrade Services 6 service types · Technical depth · Tested methodology

ECC to S/4HANA System Conversion

Converting SAP ECC to S/4HANA using SUM DMO — simultaneously upgrading the application to S/4HANA and migrating the database to HANA. Covers full project lifecycle: readiness assessment, custom code adaptation, simplification list remediation, UAT, dress rehearsal and production cutover with tested fallback.

Suite on HANA Migration

Migrating SAP ECC or R/3 to run on HANA database without upgrading the application to S/4HANA — delivering HANA's performance and analytics benefits while preserving the existing ECC functional landscape. Lava International's 50-day, 2-3x performance improvement demonstrates what this delivers in practice.

S/4HANA Version Upgrades

Moving between S/4HANA major releases — from 1709, 1809, 1909 to 2020, 2021, 2022 or 2023. Each version brings new functionality, changed APIs and deprecated features affecting custom ABAP. We identify breaking changes, adapt the code and validate functionality before production upgrade.

Cloud Migration (RISE / Hyperscaler)

Moving SAP from an on-premise data centre to cloud infrastructure — RISE with SAP managed cloud, or hyperscaler (AWS, Azure, GCP) self-managed. The SAP application moves; the business processes stay. Infrastructure migration that changes who manages the servers without changing what the system does.

Custom Code Adaptation

Every SAP upgrade changes or removes APIs, database tables and syntax that custom ABAP may depend on. We run SAP's Custom Code Migration Cockpit and ABAP Test Cockpit across every custom object — not a sample — identify every compilation error and adapt the code before the production upgrade runs.

Upgrade Readiness Assessment

Before committing to an upgrade project — SAP Readiness Check output analysis, custom code volume and complexity, functional delta between releases, data volume for downtime estimation and a risk-stratified plan with realistic timeline and testing scope. Prevents scope surprises after the project has started.

Migration Approaches

Three ECC-to-S/4HANA migration approaches — choosing correctly before committing

The migration approach is the most consequential scoping decision of an ECC-to-S/4HANA project. Each approach has different timelines, risk profiles, data continuity characteristics and business change implications. The wrong choice costs significantly more to correct than the assessment to choose correctly.

ECC → S/4HANA Migration Approaches — Choose Based on Assessment
Brownfield — System Conversion

Convert the existing system in place

The existing ECC database is converted to S/4HANA using SUM DMO — master data, transaction history, configuration and custom ABAP all migrate in place. Business runs on S/4HANA after conversion; processes remain familiar initially.

  • Lowest go-live risk — familiar system after cutover
  • All historical transaction data preserved
  • Custom ABAP reviewed, adapted and migrated
  • Go-live disruption minimised
  • Process improvement deferred to post-go-live
  • Best for: complex ECC with large data volumes and heavy custom code
Greenfield — New Implementation

Fresh S/4HANA built on SAP Best Practices

A clean S/4HANA implementation starting from SAP Best Practices — without inheriting ECC's accumulated customisations and technical debt. Historical data migrated selectively; processes redesigned for S/4HANA standard.

  • Adopt S/4HANA best practices — no legacy constraints
  • No inherited technical debt or custom code
  • Longer implementation — full process redesign required
  • Higher change management effort
  • Selective data migration — masters and opening balances only
  • Best for: using ECC migration as transformation catalyst
Selective Data Transition (Bluefield)

Selective migration — hybrid approach

A hybrid approach migrating specific entities, company codes or business units to a new S/4HANA system while migrating required historical data. Combines clean-start benefits with data continuity for the selected scope.

  • Migrate only processes or entities you want to transform
  • Historical data migrated where compliance requires it
  • Complex technical execution — specialist tooling required
  • Useful for carve-outs, mergers and staged migrations
  • Higher cost than pure brownfield or greenfield
  • Best for: group consolidation or partial transformation

Our recommendation process: We conduct a migration approach assessment — custom code volume analysis, data volume sizing, process complexity review and transformation ambition — and provide a documented recommendation with effort estimates for each approach. The assessment takes 3–4 weeks; choosing the wrong approach without one costs months of rework.

Methodology & Risk Management

Six-phase migration methodology — and the risks it prevents

Migration and upgrade failures follow predictable patterns. Each phase of our methodology directly addresses the failure mode that organisations without a structured approach encounter — usually during the production cutover window, where the cost of discovery is highest.

01
Assessment

Readiness Check, custom code analysis, data volumes, downtime estimation, approach selection

02
Planning

Migration strategy, project plan, testing scope, team structure, cutover runbook skeleton

03
Preparation

Custom code adaptation, pre-checks, test environment, pre-archiving to reduce DB volume

04
Testing

Functional regression, integration testing, performance benchmarking, UAT, defect resolution

05
Cutover

Dress rehearsal (mandatory), go/no-go gate, production execution, fallback on standby

06
Stabilisation

Hypercare, performance monitoring, issue resolution, KT to AMS team

Six migration risks our methodology prevents

Custom Code Failures at Go-Live

Incomplete ABAP analysis leaves programmes that fail on the new release. We scan every custom object — not a sample — and adapt all breaking changes before the production upgrade runs. Code that compiles in QA goes to production; unknown failures do not.

Extended Cutover Downtime

SUM DMO runtime is proportional to data volume. We run at least one full dress rehearsal on a production-equivalent system with actual production data — measuring the real cutover window before committing the production slot. No surprises during the live window.

Interface Failures Post-Migration

Migrations change IP addresses, hostnames and RFC destinations. Every integration point is documented, tested in the migrated environment and validated before production cutover — not discovered by the business the morning after go-live.

Simplification List Non-Compliance

S/4HANA removes data models ECC relied on — MARA fields, LIS tables, FI document structures. Simplification list items not addressed before conversion cause data inconsistencies. We validate every applicable item against your active transaction data before the upgrade runs.

No Fallback Plan

Every production cutover has a defined go/no-go decision point and a documented rollback procedure. The fallback plan is rehearsed before the live window — not written under pressure at 3am when a cutover step fails unexpectedly.

Performance Regression Post-Upgrade

New releases change query execution plans, buffer configurations and HANA memory behaviour. We benchmark key transactions in the upgraded QA system against production baselines — identifying regressions before they reach users, not after the business reports slowdowns.

Case Study

SAP migration in practice — Lava International

SAP Migration Case Study
Lava International
Mobile Phones & Electronics Suite on HANA Migration AnyDB → SAP HANA
Delivered by
2iSolutions
SAP Gold Partner
The Migration Challenge

Lava International — one of India's leading mobile phone and accessories manufacturers — needed to migrate their SAP business application landscape from a traditional AnyDB platform to SAP HANA, targeting both the in-memory performance improvements and the S/4HANA platform readiness that HANA enables.

How 2iSolutions Delivered

2iSolutions executed the Suite on HANA migration in 50 working days using a structured methodology — mandatory dress rehearsals before the production cutover was committed, comprehensive interface validation and pre/post performance benchmarking. Post-migration, 2iSolutions continues as Lava's SAP AMS partner.

50
Working Days
Complete HANA migration — full methodology
2–3×
Performance Improvement
Across reporting & transactions
30%
Operating Cost Reduction
Post-migration SAP AMS engagement
Why 2iSolutions

What makes our migration & upgrade practice different

Dress Rehearsal — Non-Negotiable

We do not execute a production cutover without at least one full dress rehearsal on a production-equivalent system with actual production data volumes. The dress rehearsal is where surprises should be found — not during the production window. Every dress rehearsal is timed, documented and used to refine the cutover runbook before the live execution.

Full Custom Code Scan — Not Sampling

Our custom code analysis covers every custom ABAP object in the repository — not a statistical sample. We use SAP's Custom Code Migration Cockpit and ABAP Test Cockpit to identify every compilation error, deprecated API usage and removed database table access. Incomplete scanning is the most common cause of upgrade project overruns — discovered during the production upgrade when corrections take hours under time pressure.

21 Years of SAP Technical Depth

We have been implementing and managing SAP since 2005 — R/3, ECC 6.0, support package stacks, Suite on HANA, and S/4HANA 2023. Our technical consultants have executed multiple SUM DMO upgrade projects and understand how each S/4HANA release changes the upgrade execution, custom code requirements and post-upgrade stabilisation. This is institutional depth, not project-by-project learning.

Pre-Migration Archiving Assessment

SUM DMO runtime is directly proportional to data volume. We include a pre-migration archiving assessment in every ECC-to-S/4HANA project — identifying the highest-volume archivable objects and scheduling archiving runs to complete before the migration window. For large ECC systems, pre-migration archiving compresses the SUM DMO runtime by 30–50% — making the difference between a feasible cutover window and one that extends into business hours.

Post-Migration AMS Continuity

The team that migrates the system continues as the AMS partner — knowing exactly what changed, what was adapted and what edge cases surfaced during migration testing. Lava International's 30% cost reduction came from this continuity: the AMS team that managed the post-migration hypercare had the full migration context to deliver structured co-innovation, not just reactive support.

SAP Gold Partner — Direct SUM DMO Escalation

SUM DMO encounters undocumented errors in complex landscapes. Gold Partnership provides direct SAP technical support escalation — access to SAP's upgrade specialists, undocumented SAP Notes and a technical advisor relationship that resolves blockers faster than a standard customer support ticket. When a production upgrade is in progress, resolution speed matters in hours.

Track Record

SAP migration & upgrade delivery from a Gold Partner with 21 years of technical depth

Our upgrade and migration practice is built on SUM DMO execution experience, brownfield conversion methodology, Suite on HANA migration delivery and post-migration AMS continuity — across manufacturing, high tech, pharma and real estate landscapes.

50 daysLAVA INTERNATIONAL SUITE ON HANA
2–3×PERFORMANCE IMPROVEMENT POST-HANA
SAP GoldPARTNER — S/4HANA & MIGRATION CERTIFIED
98%ON-TIME DELIVERY ACROSS SAP PROJECTS
FAQ

SAP migration & upgrades: frequently asked questions

What is the SAP ECC 2027 deadline and what does it mean?

SAP mainstream maintenance for SAP ECC 6.0 ends in December 2027. After this date, SAP will no longer release security patches, legal corrections or functional improvements for ECC — making continued ECC operation a regulatory and security risk. Extended maintenance (paying SAP additional fees for continued patching) may be available after 2027 but is not guaranteed or cost-effective as a long-term strategy. Every ECC organisation needs a migration plan to S/4HANA before 2027 — and migration projects for complex ECC landscapes take 12–24 months, meaning planning should begin now.

What is SUM DMO and how does it work?

SAP Software Update Manager with Database Migration Option (SUM DMO) is SAP's toolset for simultaneously upgrading ECC to S/4HANA and migrating the database from Oracle, DB2 or SQL Server to SAP HANA in a single technical operation. SUM DMO runs in phases — most processing happens while the system is still live (reducing downtime), with a final cutover phase requiring system downtime. Runtime is proportional to database size and hardware speed. We run a mandatory dress rehearsal on a production-equivalent system to measure actual runtime before committing the production downtime window.

What is the difference between brownfield and greenfield ECC to S/4HANA migration?

Brownfield (system conversion) converts the existing ECC database to S/4HANA in place — all historical data, configuration and custom code migrated. Lower go-live risk but inherits technical debt. Greenfield is a fresh S/4HANA implementation on a new system built on SAP Best Practices — without ECC's customisations, with data migrated selectively. Brownfield is faster; greenfield is cleaner. The choice depends on how much ECC customisation is worth preserving, how much process redesign the business is ready for, and whether using the migration as a transformation catalyst is a priority.

How long does an ECC to S/4HANA migration project take?

A focused brownfield conversion for a mid-size manufacturer with moderate customisation typically takes 6–12 months from project kick-off to production cutover. Complex ECC landscapes with heavy ABAP customisation, multiple company codes and large data volumes take 12–24 months. The actual SUM DMO execution takes days — the project timeline is driven by custom code adaptation, functional testing, data validation, user training and the number of integration points to test. Pre-project archiving (recommended) adds 3–6 months before the migration project starts but compresses the SUM DMO runtime and reduces risk.

What happens to custom ABAP code in an S/4HANA migration?

Every S/4HANA migration requires a custom code adaptation phase. S/4HANA removes ABAP APIs, database tables and syntax that ECC customisations rely on — removed function modules in logistics, changed MARA/MARC table fields, deprecated LIS tables, updated BAPI signatures and new ABAP syntax requirements. We use SAP's Custom Code Migration Cockpit and ABAP Test Cockpit to identify every affected object, prioritise by business impact and adapt the code before the production migration. "Adapt then migrate" — not "migrate then discover."

Should we archive data before migrating to S/4HANA?

Yes — strongly recommended and included as a standard step in our migration projects. SUM DMO runtime is directly proportional to database size. Archiving FI documents, MM material documents, SD billing documents and CO line items before the migration compresses the SUM DMO runtime significantly — and reduces the ongoing HANA memory requirement post-migration, which directly reduces the HANA subscription cost on RISE or GROW. Archiving runs should complete 4–8 weeks before the migration dress rehearsal to allow the reduced database volume to be reflected in the timed rehearsal.

Planning an ECC to S/4HANA migration — or on an older S/4HANA release that needs upgrading?

A migration readiness assessment covers custom code volume, data volumes, downtime modelling, approach recommendation (brownfield/greenfield/selective) and a realistic project timeline — before any commitment to scope or budget. Assessment takes 3–4 weeks and prevents the most expensive category of migration project failures.