SAP BW to BW/4HANA Migration Services

SAP BW to BW/4HANA Migration Services

SAP Gold Partner · BW Migration · Shell · In-Place · Remote · BW/4HANA · Maintenance 2027/2030

SAP BW to BW/4HANA Migration Services

SAP BW 7.x mainstream maintenance ends in 2027. Extended maintenance runs to 2030 — with additional fees. Every organisation running SAP BW on HANA, BW 7.5 or earlier needs a migration path. The question is not whether to migrate but which approach, when to start and how to minimise risk and business disruption.

2iSolutions specialises in SAP BW to BW/4HANA migration — delivering all three SAP-supported migration approaches (shell conversion, in-place conversion, remote conversion) with a readiness assessment that determines the right approach for your specific landscape before any migration work begins.

With 21 years of SAP BW delivery across every platform generation, our consultants bring institutional knowledge of BW object types, custom ABAP code patterns and migration pitfalls that product-trained teams do not have. This is why our migration estimates are accurate and our projects are delivered on time.

Migration Timeline Pressure
2027 — Mainstream maintenance ends
SAP BW 7.x (incl. BW on HANA) no longer receives standard support updates
2030 — Extended maintenance ends
Available at additional cost, but no new features and limited SAP support scope
Now — Start the assessment
3–4 week readiness assessment gives adequate time for a well-planned migration

Key insight: Starting assessment now (2025–2026) gives 12–18 months for migration execution — enough time for any approach. Starting in 2027 means rush migration under maintenance pressure, which is where projects overrun.

Shell ConversionMetadata only · Fastest · 3–5 months
In-PlaceFull data · Highest complexity · 6–12 months
RemoteParallel operation · Fallback option · 6–10 months
Assessment FirstObject inventory before approach recommendation
Choose Your Path

Three SAP-supported migration approaches — which is right for you?

SAP provides three migration approaches, each with different timelines, risk profiles and data retention behaviour. The right choice depends on your object count, custom code volume, data retention requirements and available downtime. We never recommend an approach before assessing your landscape.

BW → BW/4HANA Migration Decision Framework
Assessment → Approach Selection → Execution → Validation → Go-Live
Your Current BW System BW 7.x · BW on HANA · Custom code Readiness Assessment 3–4 weeks · Object inventory · Code scan Shell Conversion Metadata only · No historical data Fastest · 3–5 months · Clean start Best: data can be reloaded from source In-Place Conversion Full data + objects · Same system ID Highest complexity · 6–12 months Best: data continuity is critical Remote Conversion New system · Remote object transfer Parallel operation · 6–10 months Best: fallback needed during migration SAP BW/4HANA HANA native · ADSO · SAC-ready · Long-term support
3–12 mo
Migration timeline range by approach
3–4 wks
Assessment before recommendation
2027
BW 7.x mainstream maintenance end
21 yrs
SAP BW delivery experience
Our Services

Six migration services — from assessment to post-migration support

Every migration engagement starts with the readiness assessment. No exceptions — it is 3–4 weeks that prevent 3–4 months of rework.

BW/4HANA Readiness Assessment

Object inventory (DSOs, InfoCubes, MultiProviders, queries), custom ABAP code scan and classification, data volume analysis, BEx query usage profiling and migration approach recommendation with realistic timeline and effort estimate. Deliverable: assessment report with go/no-go recommendation.

Object Remediation & Clean-up

Pre-migration clean-up: removal of deprecated objects (aggregates, classic InfoSets, non-HANA optimised objects), DSO to ADSO conversion planning, MultiProvider to CompositeProvider mapping and InfoCube retirement. Reduces migration scope and eliminates objects that would fail conversion.

Custom ABAP Code Adaptation

BW/4HANA removes deprecated ABAP APIs and restricts certain coding patterns. We scan, classify and remediate custom transformation routines, user exits, customer functions and BADI implementations — adapting them to BW/4HANA-compliant ABAP before the conversion runs.

Migration Execution & Conversion

Technical migration delivery using the selected approach — SAP migration tools (transfer cockpit for shell/remote, conversion for in-place), object-by-object validation, process chain migration, data load verification and go/no-go checkpoint management throughout the conversion process.

BEx to SAC Query Migration

BEx query inventory assessment, usage-based priority classification, query re-creation on SAC live connection models, restricted and calculated key figure migration, workbook migration from Analysis for Office to SAC stories. Phased over 12–18 months post BW/4HANA go-live for most organisations.

Post-Migration Validation & Support

Data comparison between source BW and target BW/4HANA, query output validation, process chain stability monitoring, performance baseline establishment and hypercare support for the first 4–8 weeks post go-live. Transitions into ongoing AMS if required.

What We Assess

The 10 things our readiness assessment evaluates before recommending a migration approach

Active Object Count

How many DSOs, InfoCubes, MultiProviders, queries and InfoObjects are actively used vs deprecated

Custom ABAP Volume

Lines of custom code in transformations, user exits, customer functions and BADIs — classified by remediation effort

Data Volume & Retention

Total data volume, retention requirements and whether historical data needs to migrate or can be archived

BEx Query Inventory

Total query count, usage frequency, complexity classification and SAC migration readiness

Deprecated Object Types

Classic InfoSets, aggregates, non-HANA optimised objects and other types that BW/4HANA removes

Source System Connections

Number and type of source connections, delta extraction configurations and dependencies on source system versions

Process Chain Complexity

Number of process chains, dependencies, scheduling complexity and error handling maturity

Available Downtime Window

Maximum acceptable downtime for the BW system, which directly influences which migration approaches are viable

Infrastructure Readiness

HANA sizing, landscape availability for parallel systems (remote conversion) and cloud vs on-premise target

BDC / Datasphere Strategy

Whether BW/4HANA is the end state or a stepping stone to SAP Business Data Cloud — influences architecture decisions

Why 2iSolutions

What our BW migration practice brings to your project

21 Years of BW Objects

We have built, optimised and migrated BW landscapes since BW 3.x. When our assessment team reviews your DSOs, InfoCubes and custom transformations, they recognise the patterns because they have written them before — on previous clients, in previous versions, solving the same business problems.

Assessment Accuracy

The #1 cause of BW migration project overruns is underestimating custom ABAP remediation effort. Our assessment specifically counts, classifies and effort-estimates every custom code object — so the migration estimate is based on actual work, not assumptions.

S/4HANA Source Alignment

Most BW/4HANA migrations happen alongside or after S/4HANA implementations. Having one partner manage both means extraction configuration, delta design and master data alignment are coordinated from the start — not discovered as problems during integration testing.

Post-Migration Continuity

The team that migrates your BW can manage it post go-live. Our BW/4HANA AMS provides process chain monitoring, data load management, HANA administration and SAC connectivity — by the same people who built the landscape, not a separate support team reading documentation.

Delivery Credentials

BW migrations delivered by a team that has worked with every BW generation since 2005.

From readiness assessment through object remediation, custom code adaptation, migration execution and post-migration support — 2iSolutions delivers BW to BW/4HANA migration as a Gold Partner with 21 years of institutional BW knowledge.

21 yrsSAP BW DELIVERY
300+SAP CONSULTANTS
98%ON-TIME DELIVERY
SAP GoldPARTNER CERTIFIED
FAQ

BW to BW/4HANA Migration: questions we hear most

Custom ABAP is typically the single largest effort driver in a BW/4HANA migration — and the most commonly underestimated. BW/4HANA removes deprecated ABAP APIs, restricts certain data access patterns and eliminates object types that custom code may depend on. Our readiness assessment runs an automated code scan across all transformation routines, user exits, customer functions and BADIs, classifying each object into three categories: works as-is (no change needed), requires adaptation (deprecated API replacement, minor refactoring) and requires rewrite (fundamental structural changes). This classification produces an accurate effort estimate for the remediation phase — typically 30–40% of total migration effort for landscapes with heavy custom code. We remediate all custom code before the conversion runs, so the conversion itself is clean.

Shell conversion creates a brand-new BW/4HANA system and migrates only the structural metadata — InfoObjects, ADSO definitions (converted from DSOs/InfoCubes), query definitions and process chains — without historical data. Data must be reloaded from source systems or is not required in the new landscape. Fastest approach (3–5 months for clean landscapes) and provides the cleanest result because you start with a fresh system. In-place conversion transforms the existing BW system directly to BW/4HANA — the same system ID, same data, same everything — by converting objects in-place. All historical data is preserved but the preparation phase is extensive: every object must be assessed, remediated and converted. Higher complexity (6–12 months), higher risk, but full data continuity. The choice depends on: do you need historical data in BW/4HANA, or can it be sourced from the original system or archived?

It depends heavily on the approach. Shell conversion: minimal downtime because you build a new system alongside the old one and cut over when ready — the old BW remains operational until cutover weekend. Remote conversion: similar to shell — the new BW/4HANA system is built in parallel and the old system remains available during migration. Downtime is only for the final cutover (typically a weekend). In-place conversion: this is where downtime matters most — the existing system is being transformed. The actual conversion execution may require 24–72 hours of system downtime depending on data volume and object count, preceded by a preparation phase that can run while the system is operational. The downtime requirement is one of the key factors in approach selection — if your business cannot accept a multi-day BW outage, in-place conversion may not be viable regardless of its data continuity advantages.

For organisations with complex, customised BW landscapes — heavy custom ABAP, complex process chains, extensive BEx query libraries — BW/4HANA is typically the pragmatic first step. The migration path is well-understood, SAP tooling is mature and the BW skill set within your organisation transfers directly. BDC is strategically correct but requires a different skill set (Datasphere, data products, Databricks) and a different architectural approach (virtualisation vs ETL). Both paths extend BW maintenance to 2030. Our readiness assessment evaluates your landscape against both options and recommends the path that balances risk, timeline and strategic positioning. For many organisations, the answer is: BW/4HANA now with BDC-forward architecture — migrate to a stable, supported platform today, and transition to BDC when the organisation and the product are ready.

Yes — BEx queries migrate to BW/4HANA and continue to work with Analysis for Office and other BEx-compatible tools. They are not broken by the migration itself. However, SAP's strategic direction is SAP Analytics Cloud; BEx Query Designer receives no new features. The pragmatic approach: migrate all BEx queries as part of the BW/4HANA conversion (they come across automatically), then phase the SAC migration separately — starting with the most-used queries and working down the priority list over 12–18 months post go-live. Our readiness assessment includes a BEx usage analysis that identifies which queries are actively used, which are dormant and which are duplicates — so the SAC migration scope is realistic from the start.

Yes — and we strongly recommend it. For in-place and remote conversion, SAP's migration tools support a simulation mode that identifies conversion issues without actually modifying your system. Our standard approach runs at least one full dry run on a copy of your BW system before the production conversion. This dry run surfaces object conversion failures, custom code issues and data consistency problems in a controlled environment where they can be remediated without time pressure. For shell conversion, the entire approach is inherently low-risk because the original system remains untouched — the new BW/4HANA system is built alongside and validated before cutover. We treat the dry run as a mandatory phase, not an optional add-on — it is where 80% of migration issues are found and fixed.

BW mainstream maintenance ends in 2027. Start your assessment now.

A 3–4 week readiness assessment gives you a clear migration approach recommendation, accurate timeline, effort estimate and the confidence to plan your BW/4HANA migration without deadline pressure. No commitment beyond the assessment.